Now booking recurring site-progress flights across Greater Houston.Request a flight plan →
Services Critical Asset Inspection Site Progress & Documentation TDB 360 SiteView 2D & 3D Models Videography & Photography Industries Portfolio About Contact Call 281-965-5272
FAA PART 107 Certified · Fully Insured · Houston, TX

Aerial intelligence & marketing solutions.

RTK-capable, drone-powered asset inspection, site progress and documentation, 360 SiteView tours, and 2D & 3D models — delivered by certified pilots across Houston and Texas.

Critical Asset Inspection Site Progress & Documentation TDB 360 SiteView 2D & 3D Models Survey-Grade Mapping Project Time-Lapse
SITE_SCAN · 528 TOWN CENTERPROCESSED
2D orthomosaic map of a Houston-area construction site
AUTONOMOUS FLIGHT PLAN ORTHOMOSAIC · 2D DSM · 3D
WeeklyFlyovers
360°Site Views
2D + 3DSite Twins
Our Offerings

Flexible solutions for every stage of your project.

Whether you need to inspect an asset, prove progress, document a site, or measure it in 3D — we capture the data, process it, and deliver decision-ready results.

01Aerial roof inspection map with rooftop units and utility lines marked

Critical Asset Inspection

See every defect without sending a crew up a ladder. Safer, faster, and fully documented.

  • Roofs, structures & facades
  • High-res + thermal-ready capture
  • Findings ranked by severity
Learn more
02Orthomosaic of a construction site used for progress tracking

Site Progress & Documentation

Recurring flights and 4K photo & video turn your job site into a dated, shareable record — built vs. planned.

  • Weekly, bi-weekly or monthly flights
  • % complete by phase
  • 4K stills, video & stockpile measurements
Learn more
03TDB 360 SiteView of the Midline subdivision with labeled lots, amenities and a site map

TDB 360 SiteView

Interactive aerial 360° tours that let visitors explore a property and see where everything is.

  • Construction sites & developments
  • Golf courses, resorts & venues
  • Labels & site-plan overlays
Learn more
04Photogrammetry 3D model of a lakefront hotel

2D & 3D Models

Measurable orthomosaics, elevation maps and photorealistic 3D models — a digital twin of your site.

  • 2D orthomosaic maps
  • DSM elevation models
  • Interactive 3D photogrammetry
Learn more
10+Years of land & infrastructure survey experience
Part 107FAA-certified commercial remote pilots
$1MLiability insurance on every flight
24–48 hrTypical turnaround on deliverables
How It Works

From takeoff to decision-ready in four steps.

One team handles the entire pipeline, so you never chase a pilot, a processor, and an analyst separately.

01

Data Collection

Certified pilots fly planned, repeatable missions with RTK-capable GNSS positioning and 4K sensors — capturing hard-to-reach areas safely.

02

Processing & Analysis

Photogrammetry turns thousands of images into orthomosaics, elevation maps and 3D models, then we review every finding.

03

Reporting & Insights

Clear PDF reports, annotated imagery and shareable links — findings ranked by severity, progress by percent complete.

04

Ongoing Monitoring

Repeat flights build a time-lapse history of the site, so changes, risks and delays surface early — not at closeout.

From concept to finished video in four steps.

One team plans, flies, edits and delivers, so you never juggle a pilot, an editor and a colorist separately.

01

Plan & Storyboard

We learn your goals, audience and locations, then plan the shot list, flight windows and permissions before anyone picks up a camera.

02

Capture

Certified pilots shoot cinematic 4K aerial footage, with ground and interior video added when the project calls for it.

03

Edit & Color Grade

We cut the story together, grade the color, add music and titles, and polish it into a finished video.

04

Deliver & Publish

Final files in the formats you need for your website, social channels and listings, with revisions until it is right.

From first call to live website in four steps.

One team designs, builds and launches your site, so you never chase a designer, a developer and a host separately.

01

Discovery

We start with a call about your business, customers, goals and the pages you need, and gather your brand and content.

02

Design

A custom layout in your colors and voice. You review it and give feedback before anything is built.

03

Build & Launch

A fast, mobile-friendly, search-ready site, connected to your domain and tested before it goes live.

04

Support & Updates

Hosting, edits and new pages as your business grows, so the site stays current without the hassle.

Start Your Project
Site Progress & Documentation

An unbiased view of your entire job site.

Every flight becomes a dated, bird's-eye record of what's really built — so owners, lenders and GCs can verify progress without a site visit.

  • Consistent flight paths for true apples-to-apples comparisons
  • Percent-complete reporting by site phase
  • Documentation for pay apps, draws and dispute resolution
  • Stockpile and earthwork volume measurement
TDB_360_SITEVIEW · 528 TOWN CENTER · OCT 31 2026
Latest TDB 360 SiteView of 528 Town Center, captured October 31, 2026, with site-plan footprints and labels over the aerial view
Latest survey, captured Oct 31, 2026.Open the live 360 tour
PROGRESS_CHARTS · SCROLLING PREVIEW
Percent complete by phase, build-out by flight and more.Open full charts
2D orthomosaic map
2D ORTHOMOSAIC · MEASURABLE
DSM elevation map color-coded by height
DSM · COLOR-CODED BY HEIGHT
Photogrammetry 3D model of a lakefront hotel
2D & 3D Models

Your site as a digital twin.

Thousands of drone images are stitched into survey-style maps and photorealistic 3D models you can measure, rotate and share from any browser.

  • 2D orthomosaics — measure distances and areas on a true-scale map
  • DSM elevation maps for grading, drainage and volumes
  • Interactive 3D photogrammetry models of buildings and sites
See 2D & 3D Models

TDB Solutions Service Video

Why TDB Solutions

Licensed in the air. Experienced on the ground.

FAA Part 107 Certified

Fully licensed and compliant, with $1M liability insurance on every mission.

10+ Years in the Field

Land, pipeline, utility and ROW survey experience — we understand the ground, not just the sky.

Pro-Grade Equipment

4K and thermal-capable aircraft with precision GPS — the right tool for every mission.

Fast Turnaround

Polished deliverables in as little as 24–48 hours. No agency waiting games.

Google Reviews

What our clients are saying.

5.08 reviews on Google
“TDB Solutions has been a huge asset to Williams Pool Company. From the incredible drone footage, video editing and marketing content. TDB Solutions has elevated the way we can showcase our projects online. With cinematic aerial footage and clean professional social media content, TDB Solutions has helped us stand out across multiple platforms to attract more attention to our or brand. Thank You- Danny Williams”
Danny WilliamsWilliams Pool Company · Google review
“TDB Solutions exceeded our expectations with their 360 viewer and attention to detail. They provided a comprehensive commercial roof inspection, complete with high-quality aerial imagery and a detailed written report. Their thorough documentation and clear findings made it easy to assess the roof’s condition. Highly recommend their services.”
Atom BombGoogle review
“Built me a very professional website for half the price of what I was charged by the last company who did not do half as good a job. Also had them film some drone footage 10/10. They were very helpful and professional throughout the process. TDB helped get my business on track and I can’t thank you enough!”
jb gGoogle review
“TDB Solutions Provided me an amazing aerial data for our job site 10/10 will definitely use again! Appreciate the service!”
Henry YanceyGoogle review
“Highly recommend! TDB Solutions provided excellent 2D & 3D maps for our construction site, will use for future projects. Great work”
Alex BatesGoogle review
“TDB Solutions provided excellent aerial videography and photography for our real estate listing. Highly recommend!”
Michaela EnsingGoogle review
FAQ

Is TDB the right fit for your project?

What is aerial intelligence?

It's the process of turning drone-captured imagery into answers: where a roof is failing, how much of a site is built, how much dirt has moved, or what a property looks like from every angle. We handle the flying, the processing and the reporting.

What assets can you inspect?

Roofs, building exteriors and facades, structures, towers and other elevated or hard-to-reach assets. Tell us what you manage and we'll scope the right sensors, flight plan and deliverables.

How often can you fly for site progress tracking?

As often as your project needs — weekly, bi-weekly, monthly, or at key milestones. We repeat consistent flight paths so each dated record compares cleanly with the last.

What do I receive after a flight?

Depending on the scope: 2D orthomosaic maps, DSM elevation maps, interactive 3D models, annotated inspection or progress reports in PDF, TDB 360 SiteView° tours, and edited 4K photo and video. Typical turnaround is 24–48 hours.

Do I need to be on site?

No. That's the point — your team can review everything remotely. We coordinate access and safety on the day of the flight.

Are you licensed and insured?

Yes. Every pilot is FAA Part 107 certified, and TDB carries $1M in liability insurance. We're also a BBB Accredited business. A certificate of insurance is available on request.

How accurate are your maps and models?

Accuracy depends on the mission and whether ground control points are used. For higher-accuracy work we fly RTK-capable missions with a DJI Matrice 4 Enterprise and an Emlid Reach RS3 GNSS base station, which tags each image with centimeter-level positioning. For measurement-critical work we plan the flight and control to match your tolerance — just tell us the requirement up front.

Where do you operate?

We're based in Friendswood and serve the Greater Houston area and projects across Texas. Reach out for work farther afield.

Let's Get Started

See your assets and job sites from above.

Tell us about your project and we'll send back a flight plan and quote — fast.

4310 Saffron Ln · Friendswood, TX · Serving Greater Houston & Texas